Used with appropriate refractory aggregates, CIMENT FONDU® mortars & concretes can withstand temperatures up to 1250°C.
Applications
Fireplace & chimney construction
Barbecues & pizza ovens
Incinerators
Foundry floors & metallurgical works
With suitable aggregates Ciment Fondu can withstand temperatures from -180°c to +1250°C
Preparation
All formwork should be watertight clean and coated with mould oil. To provide a good key for bonding, the base concrete should be free of laitance and soaked with water.
Applications
Fireplace & chimney construction
Barbecues & pizza ovens
Incinerators
Foundry floors & metallurgical works
With suitable aggregates Ciment Fondu can withstand temperatures from -180°c to +1250°C
Preparation
All formwork should be watertight clean and coated with mould oil. To provide a good key for bonding, the base concrete should be free of laitance and soaked with water.
Mixing
Mix cement and aggregates in the mixer or with a shovel. The ingredients are usually added in the following order : 80% of the prepared water, corse grog, CIMENT FONDU®, fine grog, adding the balance of the water to obtain a plastic consistency.
Casting
For the best performance, the concrete should be compacted by rodding or vibration
Demoulding
Should be done as soon as possible (normally 4-5 hours after casting for non load-bearing structures).
Curing
Due to the rapid evolution of heat during hardening, CIMENT FONDU®based concrete and mortars must be kept damp immediately after setting and during the first 24 hours by regular spraying of water, use of wet sacking.
A full Data sheet for this product can be found at Here
STOCK COMING IN ALL THE TIME - ORDER AND WE WILL DISPATCH ASAP
Mix cement and aggregates in the mixer or with a shovel. The ingredients are usually added in the following order : 80% of the prepared water, corse grog, CIMENT FONDU®, fine grog, adding the balance of the water to obtain a plastic consistency.
Casting
For the best performance, the concrete should be compacted by rodding or vibration
Demoulding
Should be done as soon as possible (normally 4-5 hours after casting for non load-bearing structures).
Curing
Due to the rapid evolution of heat during hardening, CIMENT FONDU®based concrete and mortars must be kept damp immediately after setting and during the first 24 hours by regular spraying of water, use of wet sacking.
A full Data sheet for this product can be found at Here
STOCK COMING IN ALL THE TIME - ORDER AND WE WILL DISPATCH ASAP